Skip to main content
Digital Archive Ontario Homepage
Prototype Pierhead, with sections of floating roadway attached, was tested for a whole year in all types of weather resulting in the Mulberry, a prefa(...)
Prototype Pierhead, with sections of floating roadway attached, was tested for a whole year in all types of weather resulting in the Mulberry, a prefa(...)

Prototype Pierhead, with sections of floating roadway attached, was tested for a whole year in all types of weather resulting in the Mulberry, a prefa(...)

Date11/3/1945
Names
(photographer)
Format
Notes
Original Toronto Star caption: Prototype Pierhead; with sections of floating roadway attached; was tested for a whole year in all types of weather resulting in the Mulberry; a prefabricated harbor used to free Europe. The replica; used for Invasion; will be shown in Toronto Wednesday
Language
ProvenanceFrom the Toronto Star Archives
Usage Rights Copyright (Learn More)
Copyright HolderToronto Star (Firm)
Call Number / Accession NumberTSPA_0019276F