Skip to main content
Digital Archive Ontario Homepage
curving Roof of the velodrome being built Montreal for the Olympic Games is near the main stadium, which was planned to have a parachute-style plastic(...)
curving Roof of the velodrome being built Montreal for the Olympic Games is near the main stadium, which was planned to have a parachute-style plastic(...)

curving Roof of the velodrome being built Montreal for the Olympic Games is near the main stadium, which was planned to have a parachute-style plastic(...)

Date12/12/1974
Names
(photographer)
Format
Notes
Original Toronto Star caption: curving Roof of the velodrome being built Montreal for the Olympic Games is near the main stadium; which was planned to have a parachute-style plastic dome. Architects speculate that soaring costs of construction will force elimination of the dome-cutting the season for the stadium and the money it takes in.
Language
ProvenanceFrom the Toronto Star Archives
Usage Rights Copyright (Learn More)
Copyright HolderToronto Star (Firm)
Call Number / Accession NumberTSPA_0096781F