Skip to main content
Digital Archive Ontario Homepage

Ahead of schedule

Date10/21/1985
Names
(photographer)
Format
Notes
Original Toronto Star caption: Ahead of schedule: Engineers are installing 12 braces to shore up a wall in Lock 7 in the Welland Canal so they can drain it to inspect the damage caused by a cave-in Oct. 14. The repair job is almost three days ahead of schedule, but officials remained unsure yesterday when shipping can resume through the canal, which connects Lake Ontario to Lake Erie, bypassing Niagara Falls.
Language
ProvenanceFrom the Toronto Star Archives
Usage Rights Copyright (Learn More)
Copyright HolderToronto Star (Firm)
Call Number / Accession NumberTSPA_0108562F