Skip to main content
Digital Archive Ontario Homepage
Proposed route of Don Valley roadway to drain traffic load from overcrowded north-south arteries, is shown by heavy dotted line on this aerial view of(...)
Proposed route of Don Valley roadway to drain traffic load from overcrowded north-south arteries, is shown by heavy dotted line on this aerial view of(...)

Proposed route of Don Valley roadway to drain traffic load from overcrowded north-south arteries, is shown by heavy dotted line on this aerial view of(...)

Date7/7/1948
Names
(photographer)
Format
Notes
Original Toronto Star caption: Proposed route of Don Valley roadway to drain traffic load from overcrowded north-south arteries; is shown by heavy dotted line on this aerial view of the Don Valley. Grading work has started and is expected to be completed in two years. Most of the land settlements have been made. Suburbs are asked to finance their sections of new roads
Language
ProvenanceFrom the Toronto Star Archives
Usage Rights Public Domain (Learn More)
Call Number / Accession NumberTSPA_0111438F