Burrowing northward from Eglinton Ave
Date2/19/1969
Names
Format
Original Toronto Star caption: Burrowing northward from Eglinton Ave.; the main tunnel of the Yonge St. subway extension is checked by resident engineer Douglas Dunn. The tunnelling has started on the first part of the fourmile extension from Eglinton Ave. to Sheppard Ave. in North York. But; Metro Council may decide to take the extension 1.4 miles further; to Finch Ave. The cost of extension to Sheppard will be $79 million. It would cost an extra $26 million to tunnel to Finch.
Subject
Medium
Language
ProvenanceFrom the Toronto Star Archives
CollectionToronto Star Photograph Archive
Usage Rights
Copyright
(Learn More)
Copyright HolderToronto Star (Firm)
Call Number / Accession NumberTSPA_0115719F