Skip to main content
Digital Archive Ontario Homepage
As the Credit River, swollen by spring runoff and heavy rain, rose alarmingly workmen abandoned a construction site south of Streetsville, building a (...)
As the Credit River, swollen by spring runoff and heavy rain, rose alarmingly workmen abandoned a construction site south of Streetsville, building a (...)

As the Credit River, swollen by spring runoff and heavy rain, rose alarmingly workmen abandoned a construction site south of Streetsville, building a (...)

Date4/13/1972
Names
(photographer)
Format
Notes
Original Toronto Star caption: As the Credit River; swollen by spring runoff and heavy rain; rose alarmingly workmen abandoned a construction site south of Streetsville; building a dam around the crane to protect it (top). Last night; however; the ragining stream broke through the dam
Subject
Country:Canada
City, town or township:Mississauga
Geograhical feature:Credit River (Ont.)
Province or state:Ontario
Language
ProvenanceFrom the Toronto Star Archives
Usage Rights Copyright (Learn More)
Copyright HolderToronto Star (Firm)
Call Number / Accession NumberTSPA_0007215F