Skip to main content
Digital Archive Ontario Homepage
Doing the arithmetic that determines how much electrical power production is costing in Ontario at the moment, and whether a surplus is available, Hyd(...)
Doing the arithmetic that determines how much electrical power production is costing in Ontario at the moment, and whether a surplus is available, Hyd(...)

Doing the arithmetic that determines how much electrical power production is costing in Ontario at the moment, and whether a surplus is available, Hyd(...)

Date8/18/1970
Names
(photographer)
Format
Notes
Original Toronto Star caption: Doing the arithmetic that determines how much electrical power production is costing in Ontario at the moment; and whether a surplus is available; Hydro system supervisors Ken Gibson (left); Ken Rusk (centre); and assitant system supervisor Merv Jessop wo
Country:Canada
Province or state:Ontario
Language
ProvenanceFrom the Toronto Star Archives
Usage Rights Copyright (Learn More)
Copyright HolderToronto Star (Firm)
Call Number / Accession NumberTSPA_0008841F