Skip to main content
Digital Archive Ontario Homepage
Ready for anything. Ontario Hydro safety specialist Michael Eisner sports a plastic safety suit intended to guard against radioactivity from leaks of (...)
Ready for anything. Ontario Hydro safety specialist Michael Eisner sports a plastic safety suit intended to guard against radioactivity from leaks of (...)

Ready for anything. Ontario Hydro safety specialist Michael Eisner sports a plastic safety suit intended to guard against radioactivity from leaks of (...)

Date8/4/1983
Names
(photographer)
Format
Notes
Original Toronto Star caption: Ready for anything. Ontario Hydro safety specialist Michael Eisner sports a plastic safety suit intended to guard against radioactivity from leaks of heavy water at nuclear plants such as Pickering, where a pressure tube ruptured this week. The suits cost Hydro $300 each.
Country:Canada
Province or state:Ontario
Language
ProvenanceFrom the Toronto Star Archives
Usage Rights Copyright (Learn More)
Copyright HolderToronto Star (Firm)
Call Number / Accession NumberTSPA_0002516F